Thanks quarter. The kids helped a lot and it really didn't take too long. 1.5 hrs to lay the tarp and about 5 hrs to cover but it would have been much quicker if the banks weren't so steep. We had to cover most of those by hand because the bobcat would probably be too much on the liner at that grade and the bobcat wouldn't have enough traction on the liner at that grade either. It was really wicking up the banks a few days ago and it was going down a little each day, now it is slowing down and you can see the banks drying out some. I think it will need a few up and downs to pack some of the loose cover material.