|
Forums36
Topics41,009
Posts558,470
Members18,528
|
Most Online3,612 Jan 10th, 2023
|
|
10 members (H20fwler, Boondoggle, canyoncreek, RAH, Brett B, rjackson, Theo Gallus, Sunil, Lina, Bigtrh24),
1,025
guests, and
410
robots. |
Key:
Admin,
Global Mod,
Mod
|
|
|
Joined: Sep 2014
Posts: 3,668 Likes: 57
|
Joined: Sep 2014
Posts: 3,668 Likes: 57 |
I ran a total of 2200' of air line to get to the last of the 6 diffusers. I used two inch for the first 1500'. Bought it at a plumbing supply in 500' rolls. I did the ditch thing but have still not buried the line. Connections have leaked on a few occasions due to line movement from weather. So I would suggest leave any connections above ground. I think I have solved the leak problems using a screw on connection when connecting two lines together. As another note I wish I had run the larger 5/8" weighted tubing to the longest sinking tubing line(150') I most likely will change that out this summer.
Do not judge me by the politicians in my City, State or Federal Government.
Tracy
|
|
|
Moderated by Bill Cody, Bruce Condello, catmandoo, Chris Steelman, Dave Davidson1, esshup, ewest, FireIsHot, Omaha, Sunil, teehjaeh57
|
|
|