Thanks Stick it took 13 / 80lbs bags of concrete to make that slab and we had quite a bit of filler rocks... I forgot how much fun mixing 80 bags of concrete is. lol It wasn't easy but it will be well worth it. Were gonna make the entire dock out of 2x6 treated lumber. Course the posts will be galvanized posts with adjustable dock sleeves to raise and lower the dock as needed. I for sure will take pics as we go and post them...

RC


The only difference between a rut and a Grave is the depth. So get up get out of that rut and get moving!! Time to work!!