Digging clay to build up the tank dam and repair the spillway on this small pond. They also repaired two other pond tank dams on the property.
Bridge #1 set in place. Dirt/rock approaches to follow.
Bridge #2 set in place. This was a 45 foot flatbed trailer that we cut the undercarriage off of. Posts were welded to the bottom.
Trackhoe carried it to the creek and set it in place. Dirt/rock approaches to follow. We will also replace the rest of the boards.
Bridge #3:
This one was built in place where the road was washed out by the heavy rains. The trackhoe pushed four ten(10) foot long 5" pipe posts(1/2" wall) into the dirt like tooth picks. They only drilled 3 foot deep pilot holes.
#3 Nearing completion. The sucker rods were heated, bent down and welded to the pipe.
We also added sucker rod to two existing cattle guards for smoother transition.