Busy week at the farm.......

Digging clay to build up the tank dam and repair the spillway on this small pond. They also repaired two other pond tank dams on the property.





Bridge #1 set in place. Dirt/rock approaches to follow.



Bridge #2 set in place. This was a 45 foot flatbed trailer that we cut the undercarriage off of. Posts were welded to the bottom.



Trackhoe carried it to the creek and set it in place. Dirt/rock approaches to follow. We will also replace the rest of the boards.



Bridge #3:

This one was built in place where the road was washed out by the heavy rains. The trackhoe pushed four ten(10) foot long 5" pipe posts(1/2" wall) into the dirt like tooth picks. They only drilled 3 foot deep pilot holes.



#3 Nearing completion. The sucker rods were heated, bent down and welded to the pipe.



We also added sucker rod to two existing cattle guards for smoother transition.