Had the trailer pulled to the back of the property and turned over so the under carriage can be cut off. Then it will be set across the creek.



I also had this little 10' X 20' cattle guard bridge built for one of the creek crossings. They welded posts to the bottom, set and marked holes, dug the holes, set it in place and poured concrete.


This skid steer dug each 4 foot hole in 20-30 seconds. I was amazed.

Setting it in the holes.