This is what the new water level looks like running at 4" over the new full pool level or in other words 12" over what was the old full pool level.
I knew on part of the bench I would need to add two or three inches of gravel to get it back up level with full pool water level. The south part of the pond was ok as it has always been a little "high". But it looks like I will need more like 3-4" on part of it. A little more than I thought or else I got the plastic 90 cut off a little higher than I thought.

Will know closer for sure when the water drains down to full pool. The road is solid (already rock underneath) and I have already been hauling and dumping some crushed rock on it using a tractor loader. When the water gets down I will do the final grading.

Attached Images
IMGA1910.JPG IMGA1903.JPG IMGA1912.JPG IMGA1911.JPG IMGA1913.JPG

John

I subscribe to Pond Boss Magazine