pond is 90% done. they have a little bit of finish work today and putting rip rap around pond edge maybe this weekend. liner is supposed to be in today or tomorrow. beach sand will be put in later on. two downspout tiles were running into hayfield so they will be connected in yard and ran into the pond to help fill and keep pond full. depth at deepest part is 15 foot and should be half acre or a bit more in size. hoping to get grass seeded around it by next weekend and some rye in the pond basin. weather looks like no rain for awhile so all the pond structure will be in this weekend. just hope to get the crayfish in this fall and probably wait on the FHM and GSH until spring at this point.

Attached Images
file (1).jpg file (2).jpg file (3).jpg file (4).jpg file (5).jpg file (6).jpg file (7).jpg

.75 acre pond dug in September 2016. YP, HBG, HSB, SMB, and RES.