Sorry for not getting back to you sooner---been very busy. Just an update.

I got in touch with the contractor, who I've been trying to hire to install the dam drainage system since last fall.

He says he will arrange for someone from Soil Conservation to take a look at the dam next week and determine the appropriate size for the pipe. And that he can't get to the job before August or September. This is fine by me. Usually the dry season.

However I'm not holding my breath. Things like this always run late, and sometimes never happen, but I think sending the SC person out is a good sign. Fingers crossed.


Last edited by NancyGA; 05/10/16 08:58 PM.