Update. Got my pine trees in as well as starting to get some SMB beds going. The bottom rock pile at 14'-10' is now covered. Guessing pond is about 18' at deepest. Would estimate pines start at 10' and stand up to 5' or so. Also guessing pallets are at 3' and 5'. I believe second rock pile is starting at 10' too. I only know how to measure depth once a BOW is full. Haha. Things have been too wet but I have dump trucks lined up to haul some major tonnage of rip rap to run down the corners once things dry out. Patio is getting busted up so I have 4' sections of concrete I am going to step down the sides coming off the point. Beach will be going on and hoping perimeter stone too. Those are the plans for now. Life happens, plans change but things are filling in quickly!

Attached Images
IMG_9068.jpg