Originally Posted By: Custom 68
I am continuing to watch this, I am afraid my leak is bad enough it would not work in my situation. I am loosing about 1.25 inches per day at full pool. It drops to a certain level and stabilizes. All the leaks everybody is working with is much much less. It is tough for me to find good clay around here to have it lined.


My test post was losing about 12" weekly - worked in that scenario, and the average loss from guys with whom I've worked are around 1"+ daily. Feel free to reach out anytime to chat, here to help in any way I can.


Many men go fishing all of their lives without knowing that it is not fish they are after. ~ Henry David Thoreau

[Linked Image from i1261.photobucket.com]