In the last 3 to 4 weeks we have had 4+ inches of rain and 15 inches of snow. Puddle is up 3 to 4 feet. I spent a lot of money this past summer on waterways and erosion control to maximize my large watershed input, in a good way, to the pond. I may have gone too far. I am only 2 feet from overflow and rain is in the forecast. My pond is on almost flat ground so there is no spillway. Thought now is to expand the pond again to get material to build an embankment with a rip rap spillway that dumps when the water level reaches the surrounding grade.

Last edited by Bill D.; 11/29/15 08:44 PM. Reason: Clarification

[Linked Image]
Be Brave Enough to Suck at Something New!