I agree. I have decided to wait until 2017 for both the concrete and the asphalt work. I added more stone to the driveway again this year. I have about 18 inches of stone base now (8 inches minimum recommended for asphalt). By 2017 I hope to have the best possible base for the asphalt.


[Linked Image]
Be Brave Enough to Suck at Something New!