Update....

Finally got the 1000 yds or so of soil piles away from the pond and the rough grade is done. The black dirt I saved has been dropped in piles at appropriate locations for final grade work. Two inches of rain shut us down but hope to get back at it the end of this week. The 3 to 5 inch base stone is ordered for around the pond and the waterways. The erosion mat for the waterways is on site and ready to install.

Hopefully, I will be posting new pics soon showing a more complete pond and landscape! It has been two very very long years of staring at mountains of dirt and ugly landscape. Keep yer fingers crossed my friends! I would love to finally start getting some things to closure!!!!!!


[Linked Image]