Thanks for the picture. That is what I was planning on doing but I would put a walkway in the center of the two pipes. The cross bracing is something I did not think of. Can the pipes and walkway be 20 foot long and still be stable in wave action? I would put more floats on the main dock to support the walkway.
I would love to put some pictures up just don't know how yet.