So I just got off the horn with one of the local HE rental places and he suggested that I get a dozer be cause of the amount of soil I will be moving will be significant and doing it 1 bucket full at a time with an excavator will take for ever.

Is this something I should consider? My thoughts were that the size would be of the eventual pond would be too small to get a dozer in there. Currently the area of sprawl from the spring is about 1 acre in total size but I am trying to make the pond at least 1/2-1/4 of that, any suggestions?

Last edited by Whacker; 01/29/15 03:18 PM.