One other thought. You said you have repaired the levees. Would it be possible to put in a new overflow pipe in another area of the impoundment, then cap the old pipe? Might be easier to eliminate the old problem altogether and work with a new overflow pipe.
Last edited by snrub; 09/18/14 11:23 AM.