oops. How do you edit a message?

The daily rate was $500 - $62.50/hour.

Bobdad, no where to put dirt? Why not make the dam bigger? Most dams are 3' above water, 10' wide and 1 - 3 slope. What if you raised it to 6', made it 20 or 30' wide and changed the slope to 1-6? It would be a lot easier to mow/maintain.