Originally Posted By: esshup
I'd be leery of putting a primary valve on the "out" side of the pipe going thru the dam. That would mean that the pipe in the dam would be pressurized at all times, and a tiny pinhole leak in the pipe could grow and compromise the dam, causing it to fail.


Is there another way it can be done?