We also do as esshup says about driving over the big rocks befor putting the smaller stuff on top. Some we have left up to 6 months and driven over it before top dressing it with the final smaller rock layer. We also try to do this on new building sites.

I have never used the fabric but I bet it would be good. What often happens is most of the road ends up good but will have a few spots that "break through" and create a mud hole that has to be re-filled. I bet the fabric would help with those soft spots.


John

I subscribe to Pond Boss Magazine