LAUNCH DAY!!!!!!!!!!!!!!

So this was VERY challenging. My wife called me Noah for about a month building this thing so far from the water.... but i needed flat ground and electricity, so the problem was unavoidable.

We used 10 friends, lots of red-neck engineering (actually had an engineer friend helping), a flat bed trailer, PVC to roll the deck on, and a front end loader to help push. Here are the pictures of the event!





















Last edited by Dustin Pratt; 09/13/12 11:13 PM.