Also on the middle of the pond where the creek bed runs though the left over stuff from the timber cutting we are going to pile up and cover with dirt to make mounds out in the pond. Plus I still have a lot of stumps two piles that we saved that are going in too.

And we changed the slopes the front will be a 2:1 and the back will be a 4:1 to make mowing the dam easier.

Last edited by kanima; 10/05/09 09:39 AM.