Well the dam is at final elevation and most of the pond basin has been shaped. Need to do some cleanup, install the siphon system (Pipe), and create two diversion ditches to get more water to the pond. Should take 2 – 3 days but we will see. Need to lay some stone in a couple of areas and that may not happen till next week some time. Then the real work starts for me, I have to get FS in to lime the area and I have to put in fish structure, fertilize and plant the area, put up wood duck boxes, etc. Hopefully I can get this all done this month yet. If anyone is bored I can solve that problem. Slideshow of today’s progress http://s290.photobucket.com/albums/ll243/lassig/pond/day9/?albumview=slideshow