Brettski,
OK...to this point, what would you have changed or re-engineered?
There is one change I am going to make after the water temps are comfortable. The ramp needs more flotation to be level with the barge. I will replace the 12 inch high front float with an 18 inch one. The additional flotation and the additional height should do the trick.
Chris,
Do you have a cost estimate or would you rather not say?
Approximately $ 3000, excluding trolling motors and labor. The labor would probably triple the price, but I work free for me! Actually I don’t think of it as work because designing something, building it and seeing it actually work is extremely rewarding.
Sunil,
Make sure to post the time and date for the maiden voyage. I need to be prepared.
Understood!
Bobad,
Be sure to let us know how the trolling motor works, because all that poling gets tiresome.
You know me, there will be a full report!