I finished up the deck installation including adhesive and screwing the deck to the frame, I also filled the joints and imperfections in the plywood with 3M Fast Cure Adhesive Sealant 4200. After it cures this stuff can be sanded and painted or coated.

The pedestal mounts and cleats are sitting in position and will be attached after the Durabak coating is applied.






Each corner of the barge has a drain port like this one and there is a 1/2" wide channel all the way around the deck perimeter for drainage










Life is Good on Bremer Pond

Bremer Pond Weather