Back to working on the Barge after a couple months on crutches. This is fun!

The first four photos are a pre-assembly test fitting of the wring conduit from the battery box to the front and rear electrical control boxes.

The last photo is a pre-assembly test fitting of the control boxes. The one on the left is for the front and contans two 12 volt source sockets, a trolling motor socket, and the rear thruster solenoid control switch. The rear box contains one 12 volt source socket and a trolling motor socket.








Life is Good on Bremer Pond

Bremer Pond Weather