Pond Boss Magazine
https://www.pondboss.com/images/userfiles/image/20130301193901_6_150by50orangewhyshouldsubscribejpeg.jpg
Advertisment
Newest Members
Shotgun01, Dan H, Stipker, LunkerHunt23, Jeanjules
18,451 Registered Users
Forum Statistics
Forums36
Topics40,900
Posts557,095
Members18,452
Most Online3,612
Jan 10th, 2023
Top Posters
esshup 28,415
ewest 21,475
Cecil Baird1 20,043
Bill Cody 15,110
Who's Online Now
11 members (Sunil, jpsdad, azteca, esshup, BillyE, H20fwler, FishinRod, Augie, PRCS, LeighAnn, bstone261), 726 guests, and 281 robots.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
#459201 11/16/16 10:05 PM
Joined: Dec 2011
Posts: 224
B
OP Offline
B
Joined: Dec 2011
Posts: 224
Is this possible given the soil has a 3 ft section of mud that needs removed ? Construction is on day 13 , I am not paying this amount but builder said he will lose $ on my project. Soil has layers of clay but the mud/sand has been the issue. What is average cost per day running dozer and excavator ? They have hauled some of the mud off site as well to a near bye location. They are experienced and they told me from the start they would make this work for me and do it right. I believe most days have 2-3 people on site operating.


I Subscribe!
3/4 Acre Pond: HSB,SMB,YP,HBG,RES
Joined: Oct 2015
Posts: 2,424
Likes: 19
J
Offline
J
Joined: Oct 2015
Posts: 2,424
Likes: 19
Around here, I believe a typical excavation for a half acre pond would take about six days with a dozer and backhoe and cost around $6,000.

Joined: Apr 2013
Posts: 275
P
Offline
P
Joined: Apr 2013
Posts: 275
We don't have the mud and sand problems in much of this area so I'm not sure how much that raises the costs. Our heavy yellow clay all the way down allows a pond to be dug about anywhere that will hold water. From what I've seen and experienced here, a 1/2 acre pond costs about 5 or 6K also on cleared land.

Joined: Jun 2014
Posts: 66
W
Offline
W
Joined: Jun 2014
Posts: 66
In My area a good estimate is $1000 per day per piece of equipment. I have perfect clay, if you dig a hole it holds water. I have 2 half acre ponds and I'm sitting right at $40000 for both. Hauling dirt is very expensive. My dirt did not go very far at all or my cost would have been much more. Remember the farther the dirt goes the more trucks you need or your excavator is sitting idle waiting for the truck to get back.

Joined: Dec 2011
Posts: 224
B
OP Offline
B
Joined: Dec 2011
Posts: 224
Yeah, I just purchased the property and it has 5 acres so not much choice in terms of where the pond could go. I guess I am lucky I had a contact with a good builder or I would assume most would have quoted me too high or I would have been stuck with a per hour cost that would have escalated quickly due to all the mud. He did say that one of the operators is training and some days there have been 1 guy , others 2 or 3. He took out the extra topsoil to sell in the Spring and didn't charge me on those trucks. Tough situation, wanted more than 1/2 acre but given that he isn't charging me his regular rate and the cost of the job so far can't do much about it.


I Subscribe!
3/4 Acre Pond: HSB,SMB,YP,HBG,RES
Joined: Jul 2010
Posts: 3,793
Likes: 71
Zep Offline
Hall of Fame 2014
Offline
Hall of Fame 2014
Joined: Jul 2010
Posts: 3,793
Likes: 71
beastman....$40K-$50K for a 1/2 acre pond seems really high.

Not sure how many unusual circumstances are involved, but typically I would think $7K-$17K would be the ballpark price range depending on locale and geography/soil circumstances.


Fishing has never been about the fish....

Joined: Jun 2012
Posts: 2,058
Likes: 7
D
Offline
D
Joined: Jun 2012
Posts: 2,058
Likes: 7
Our flat land pond took one dozer, one high hoe and one truck. 60% of the clay was trucked out seven truck loads of top soil were sold and trucked away. We ended up with a 1 acre pond at about 1,000,000 gallons deep. High hoe was $110 per hour, dozer was $100 per hour and the truck was $75 per hour. All Canadian funds. We were one week with one guy most of the time with the truck two guys. We ended up at $12,000 Canadian with $4000 in trees.

Cheers Don.


[Linked Image from corvettejunkie.com]
http://www.pondboss.com/subscribe.asp?c=4


7/8th of an acre, Perch only pond, Ontario, Canada.
Joined: Jan 2008
Posts: 8,792
Likes: 68
Chairman, Pond Boss Legacy award; Moderator; field correspondent
Lunker
Offline
Chairman, Pond Boss Legacy award; Moderator; field correspondent
Lunker
Joined: Jan 2008
Posts: 8,792
Likes: 68
.25 ac pond with agridrain installed cost me $2500 8 yrs ago.

.75 ac pond cost $7k two months ago.

Pricing seems exceedingly high.


Many men go fishing all of their lives without knowing that it is not fish they are after. ~ Henry David Thoreau

[Linked Image from i1261.photobucket.com]


Joined: Jan 2009
Posts: 28,415
Likes: 793
Moderator
Ambassador
Field Correspondent
Lunker
Online Content
Moderator
Ambassador
Field Correspondent
Lunker
Joined: Jan 2009
Posts: 28,415
Likes: 793
TJ, it all depends on the quality of the dirt involved, and how far it has to be moved to be disposed of. Machine and operator time here is between $100 - $200 per hour depending on the machine, and can be $125/hr just for the machine, not including labor, fuel, delivery (including oversize permits) or maintenance.

When a single machine can burn 5-8 gallons of diesel per hour costs can go up fast.

That's why I like to get things as dry as possible, moving slop costs extra in time and material.

I had roughly a week here in just moving/grading/distributing dirt that was taken out of my pond, and that is with a dump truck, excavator, ASV and a dozer. 2 guys running those 4 pieces of equipment.

That doesn't count the 2500-2700 cubic yards of sand that we took to my parents place, 7 miles away. That was 2 trucks, a guy on an ASV and me on the backhoe loading the trucks. Those were 2 LONG days of moving dirt!!!!!


www.hoosierpondpros.com


http://www.pondboss.com/subscribe.asp?c=4
3/4 to 1 1/4 ac pond LMB, SMB, PS, BG, RES, CC, YP, Bardello BG, (RBT & Blue Tilapia - seasonal).
Joined: Dec 2011
Posts: 224
B
OP Offline
B
Joined: Dec 2011
Posts: 224
Yeah, it was the mud / slop that is the issue, they can't get equipment to push it, have to dig it out and move it out. Maybe if they had time they could have let it dry out some and move layers? No idea how that all works. I am sure if this were a regular customer and he had his standard pricing this would add up bad....

He told me when I bought the property he would make the pond work for me...however, I don't think he thought there would be this much slop to move around. My guess is he's just charging me mostly fuel cost and some labor. He has someone training on this site and one of the owners doing most of the work so going to eat a lot of the equipment appreciation / labor cost etc....

They are a very successful company but still feel bad they are going to eat so much cost..


I Subscribe!
3/4 Acre Pond: HSB,SMB,YP,HBG,RES
Joined: Feb 2005
Posts: 105
B
Lunker
Offline
Lunker
B
Joined: Feb 2005
Posts: 105
I'm across the Ohio river from you and have been involved in the building of a few ponds,including my own in 1984. I've never heard of such costs, but my experience is in the past and I'm not up on current heavy equiptment costs. It's hard to push mud & if you have to truck it off site prices skyrocket. Is there no place on your 5 acres to dump and let it dry ?

There wouldn't be many ponds built in no. ky. at those prices. Thankfully,we have good clay in many areas!

Joined: Oct 2015
Posts: 2,424
Likes: 19
J
Offline
J
Joined: Oct 2015
Posts: 2,424
Likes: 19
The sludge field from a cleaned out half acre pond likely will not cover quite a half acre. It took a year for mine to dry out enough to move after the clean out in August 2015. We spread and smoothed it a few months ago, then seeded it with annual rye/fescue mix. Now it looks like a wide grassy hump in the field below the pond. We pushed it up against the back of the dam and sloped it out from there, so now it tapers from nothing to about four feet deep to nothing. When sludge is first pushed out it will have the consistency of low slump wet concrete. When exposed to sun and wind, it will quickly acquire a crust that a man can walk on, but don't be deceived, it will still be totally mushy below for a long time.

Joined: May 2011
Posts: 388
Likes: 5
R
R&R Offline
Offline
R
Joined: May 2011
Posts: 388
Likes: 5
Does seem quite high. I'm in southern Indiana about two hours from cincy. I had a .68 pond built in 2007 on our previous property. Two 953 high lift's for three days and a skidsteer for half a day. no material hauled off. $5200.00. I did get very lucky it turned out good. It was pre pond boss!! Good Luck.


"If you aim at nothing you'll hit it every time"

Zig Ziglar

Link Copied to Clipboard
Today's Birthdays
Bob Lusk, GaryK, GrizzFan, PhotographerDave
Recent Posts
Relative weight charts in Excel ? Calculations?
by jpsdad - 03/28/24 04:51 PM
1 year after stocking question
by esshup - 03/28/24 04:48 PM
Fungus infection on fish
by BillyE - 03/28/24 04:35 PM
Yellow Perch Spawn 2024
by H20fwler - 03/28/24 04:29 PM
Alum vs Bentonite/Lathanum for Phosphorus Removal?
by FishinRod - 03/28/24 04:23 PM
Working on a .5acre disaster, I mean pond.
by PRCS - 03/28/24 04:13 PM
New 2 acre pond stocking plan
by LANGSTER - 03/28/24 03:49 PM
Happy Birthday Bob Lusk!!
by ewest - 03/28/24 03:37 PM
Paper-shell crayfish and Japanese snails
by esshup - 03/28/24 10:39 AM
Brooder Shiners and Fry, What to do??
by Freg - 03/28/24 09:42 AM
Dewatering bags seeded to form berms?
by Justin W - 03/28/24 08:19 AM
Reducing fish biomass
by FishinRod - 03/28/24 08:18 AM
Newly Uploaded Images
Eagles Over The Pond Yesterday
Eagles Over The Pond Yesterday
by Tbar, December 10
Deer at Theo's 2023
Deer at Theo's 2023
by Theo Gallus, November 13
Minnow identification
Minnow identification
by Mike Troyer, October 6
Sharing the Food
Sharing the Food
by FishinRod, September 9
Nice BGxRES
Nice BGxRES
by Theo Gallus, July 28
Snake Identification
Snake Identification
by Rangersedge, July 12

� 2014 POND BOSS INC. all rights reserved USA and Worldwide

Powered by UBB.threads™ PHP Forum Software 7.7.5