Pond Boss Magazine
https://www.pondboss.com/images/userfiles/image/20130301193901_6_150by50orangewhyshouldsubscribejpeg.jpg
Advertisment
Newest Members
Shotgun01, Dan H, Stipker, LunkerHunt23, Jeanjules
18,451 Registered Users
Forum Statistics
Forums36
Topics40,902
Posts557,130
Members18,452
Most Online3,612
Jan 10th, 2023
Top Posters
esshup 28,422
ewest 21,475
Cecil Baird1 20,043
Bill Cody 15,112
Who's Online Now
13 members (Sunil, Augie, Boondoggle, Jason D, PRCS, Bill Cody, Shorthose, Brett B, Layne, Angler8689, rjackson, esshup, jbird5986), 1,018 guests, and 219 robots.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Page 1 of 2 1 2
#250624 03/07/11 10:53 AM
Joined: Dec 2008
Posts: 4,791
Likes: 14
O
Omaha Offline OP
Moderator
Ambassador
Field Correspondent
Lunker
OP Offline
Moderator
Ambassador
Field Correspondent
Lunker
O
Joined: Dec 2008
Posts: 4,791
Likes: 14
I have access to a virtually unlimited amount of broken concrete pieces if I want to add this habitat to my pond. To recap, my pond is just under an acre, still being dug out. I will be stocking FHM, GSH, SMB, RES, YP, and HSB. I will be placing pvc structure, have about 10 made up currently with material for more. My question would be if it would benefit my fishery enough to make up for lost jigs. I am willing to sacrifice some displaced lures and broken lines if placing rocky habitat will substantially benefit the fishery. Because of my choice of species I realize forage will be an ongoing project, so I was thinking having that rocky habitat in there, a lot of it potentially, would benefit the forage species like FHM, GSH, shrimp, crayfish, etc. Experts tell me, if this were your BOW, would you place rock? And how much?

Joined: Apr 2002
Posts: 15,112
Likes: 478
B
Moderator
Ambassador
Field Correspondent
Lunker
Online Content
Moderator
Ambassador
Field Correspondent
Lunker
B
Joined: Apr 2002
Posts: 15,112
Likes: 478
You are lucky to have access to used concrete materials. Mixed sizes are good. Or you can group it into areas with uniform sizes. I like all sizes of broken sidewalk pieces (2"-5" thick) from reconstruction projects. Used concrete does contribute come hardness to the water but this is normally good. Often used concrete does develop a healthy or heavy growth of FA which frequently sloughs and can be good or bad. Crayfish will use heavily the concrete areas. Small fish will frequent the areas with large voids of the concrete piles. Submerged concrete pieces are ideal for minnows FHM and bluntnose minnows that deposit eggs on the underside of submerged objects.

Considering your planned species, I would rip-rap at least two complete shorelines. One or two shorelines with no or minimal concrete or some isolated large piles on the slope will add some habitat diversity and will allow some natural submerged weed growth in the future - more habitat diversity. Start with down wind shore first. Start concrete at high water line and then down to at least to what you expect to be the low water line level or a downward linear distance of 6-10ft. In some areas it would not hurt, anything that I can perceive, to have some areas where concrete goes clear to the bottom of the side slope. You could make these areas only 10-30 ft wide and then fish (jig) along the downward edges to minimize hook loss. Fish will mostly 'hang' out and travel along the edges anyway - transitions. Using a slip bobber over rip-rap shorelines is also a good way to fish with fewer snag ups. Other good ways to fish rip-rap shorelines is to fish from the corners or ends and pull the lure along the base of the rip-rap. I like to fish from a small boat and 'work' lures along the base of the rip-rap ledge.

Maybe use the larger concrete pieces to hold down (anchor)the bases of some small or medium sized entire trees placed vertical and or horizontal.

Last edited by Bill Cody; 03/07/11 12:13 PM.

aka Pond Doctor & Dr. Perca Read Pond Boss Magazine -
America's Journal of Pond Management
Joined: Dec 2008
Posts: 4,791
Likes: 14
O
Omaha Offline OP
Moderator
Ambassador
Field Correspondent
Lunker
OP Offline
Moderator
Ambassador
Field Correspondent
Lunker
O
Joined: Dec 2008
Posts: 4,791
Likes: 14
Exactly the advice I was looking for! Thanks Bill! I like the idea of separate rip-rapped shorelines. Very doable for sure. And fishing tips to boot! Much appreciated. Like creating a "highway" between my pvc structures, is this to be considered when placing them and the rock? In other words, should pvc structure be placed within the rocky habitat, on the edges, does it matter?

Joined: Jan 2009
Posts: 10,458
Likes: 2
C
Ambassador
Field Correspondent
Hall of Fame
Lunker
Offline
Ambassador
Field Correspondent
Hall of Fame
Lunker
C
Joined: Jan 2009
Posts: 10,458
Likes: 2
If it's free, go for it! Your crayfish and grass shrimp will love it and the extra hardness the concrete will produce. I think you may find the SMB will utilize the rocky rip rap and piles more than the PVC structure.

Joined: Apr 2002
Posts: 15,112
Likes: 478
B
Moderator
Ambassador
Field Correspondent
Lunker
Online Content
Moderator
Ambassador
Field Correspondent
Lunker
B
Joined: Apr 2002
Posts: 15,112
Likes: 478
Since you have ample concrete, you can use some concrete to make 'highways' between PVC and other areas such as the basin or channels and valleys or create any other 'highways' that suits your fancy. No doubt some predators will frequent and orient to specific areas of the 'highway' such as inside corners, angles or just large pieces. I would keep PVC habitat separate from concrete just for some unique structure diversity. Keep in mind that shallower place concrete is more usuable by small fish as refuge areas compared to deep water concrete in the basin of the pond. Deep structure will usually concentrate primarily larger fish. Your SMB and maybe the RES should love and thrive in the concrete jungle.

Last edited by Bill Cody; 03/07/11 12:26 PM.

aka Pond Doctor & Dr. Perca Read Pond Boss Magazine -
America's Journal of Pond Management
Joined: Dec 2008
Posts: 4,791
Likes: 14
O
Omaha Offline OP
Moderator
Ambassador
Field Correspondent
Lunker
OP Offline
Moderator
Ambassador
Field Correspondent
Lunker
O
Joined: Dec 2008
Posts: 4,791
Likes: 14
Originally Posted By: CJBS2003
I think you may find the SMB will utilize the rocky rip rap and piles more than the PVC structure.


Yeah, that's what I've read and been told. So I kept the idea in the back of my head till this weekend when I was told we have access to as much of it as we want. Wanted to run it by you guys first though. wink laugh

Joined: Dec 2008
Posts: 4,791
Likes: 14
O
Omaha Offline OP
Moderator
Ambassador
Field Correspondent
Lunker
OP Offline
Moderator
Ambassador
Field Correspondent
Lunker
O
Joined: Dec 2008
Posts: 4,791
Likes: 14
Originally Posted By: Bill Cody
Since you have ample concrete, you can use some concrete to make 'highways' between PVC and other areas such as the basin or channels and valleys or create any other 'highways' that suits your fancy. No doubt some predators will frequent and orient to specific areas of the 'highway' such as inside corners, angles or just large pieces. I would keep PVC habitat separate from concrete just for some unique structure diversity. Keep in mind that shallower place concrete is more usuable by small fish as refuge areas compared to deep water concrete in the basin of the pond. Deep structure will usually concentrate primarily larger fish. Your SMB and maybe the RES should love and thrive in the concrete jungle.


I'm really looking forward to sculpting this pond when we're "finished" with the dig. I have saved every piece of information I have received and when I'm ready I'm going to pull this up and break out a drawing board. For me I think this will be the most enjoyable part of the pond construction project (aside from eventually getting a line wet).

Joined: Jan 2009
Posts: 10,458
Likes: 2
C
Ambassador
Field Correspondent
Hall of Fame
Lunker
Offline
Ambassador
Field Correspondent
Hall of Fame
Lunker
C
Joined: Jan 2009
Posts: 10,458
Likes: 2
Some very large chunks if you can get them would be ideal. I agree with Bill that a mix is best, but some huge pieces that would create large crevices would be a good idea. I like the look of natural rock compared to concrete, but I think concrete makes better fish habitat compared to natural rock. A lot of my research and personal experience with grass shrimp leads me to believe they will heavily utilize your concrete piles. If you do end up stocking them, this will be a big bonus for the RES that will no doubt frequent the concrete piles.

Joined: Jan 2009
Posts: 28,422
Likes: 794
Moderator
Ambassador
Field Correspondent
Lunker
Online Content
Moderator
Ambassador
Field Correspondent
Lunker
Joined: Jan 2009
Posts: 28,422
Likes: 794
Omaha, just be aware that if you have large voids, and later want to stock CC, you might create spawning habitat for them. Just something to file away for the future.


www.hoosierpondpros.com


http://www.pondboss.com/subscribe.asp?c=4
3/4 to 1 1/4 ac pond LMB, SMB, PS, BG, RES, CC, YP, Bardello BG, (RBT & Blue Tilapia - seasonal).
Joined: Dec 2008
Posts: 4,791
Likes: 14
O
Omaha Offline OP
Moderator
Ambassador
Field Correspondent
Lunker
OP Offline
Moderator
Ambassador
Field Correspondent
Lunker
O
Joined: Dec 2008
Posts: 4,791
Likes: 14
Another thought as I'm brainstorming. Is it still beneficial to create specific spawning beds for my SMB with all this rocky structure? And where should they be placed in regards to it?

Joined: Dec 2008
Posts: 4,791
Likes: 14
O
Omaha Offline OP
Moderator
Ambassador
Field Correspondent
Lunker
OP Offline
Moderator
Ambassador
Field Correspondent
Lunker
O
Joined: Dec 2008
Posts: 4,791
Likes: 14
Originally Posted By: CJBS2003
Some very large chunks if you can get them would be ideal. I agree with Bill that a mix is best, but some huge pieces that would create large crevices would be a good idea. I like the look of natural rock compared to concrete, but I think concrete makes better fish habitat compared to natural rock. A lot of my research and personal experience with grass shrimp leads me to believe they will heavily utilize your concrete piles. If you do end up stocking them, this will be a big bonus for the RES that will no doubt frequent the concrete piles.


I love the thought of stocking those PK Shrimp so it's encouraging that they'll utilize the rocky habitat as well. Duly noted about the large chunks of rock.

Joined: Dec 2008
Posts: 4,791
Likes: 14
O
Omaha Offline OP
Moderator
Ambassador
Field Correspondent
Lunker
OP Offline
Moderator
Ambassador
Field Correspondent
Lunker
O
Joined: Dec 2008
Posts: 4,791
Likes: 14
Originally Posted By: esshup
Omaha, just be aware that if you have large voids, and later want to stock CC, you might create spawning habitat for them. Just something to file away for the future.


I'll keep that in mind Scott. Hopefully the fish I stock will not prompt me to stock anything further. wink

Plus, if everything goes according to plan (dream), than I'll be able to build a separate smaller pond to get our catfish fix.

Joined: Apr 2002
Posts: 15,112
Likes: 478
B
Moderator
Ambassador
Field Correspondent
Lunker
Online Content
Moderator
Ambassador
Field Correspondent
Lunker
B
Joined: Apr 2002
Posts: 15,112
Likes: 478
You could put your spawn beds for the SMB on ledges on one of the shorelines that does not have lots of concrete. Or if you have a ledge 3-5ft wide you could add small sized gravel and pea gravel mix (3/8"-3") in several areas along the ledge or a continuous span of gravel. IMO I prefer separate sections of gravel areas at least 30ft apart or placed adjacent separated with visual barriers of concrete rip-rap. If male SMB cannot see nest sites of other males then they will nest fairly close together. Concrete can be placed below the gravel patches on ledge/s and between spawning areas.

Since you are still constructing the pond have contractor make some ledges or wide steps where you want gravel and areas where you want the concrete to stop sliding down the slopes. It is a lot easier to slide / dump concrete down the pond slope or bank compared to trying to get it back up the slope becasue it slid down way too far. The ledges allow a basal stoping spot to form when adding concrete . It also tends to keep flat concrete pieces in place as years pass.

Last edited by Bill Cody; 03/07/11 05:09 PM.

aka Pond Doctor & Dr. Perca Read Pond Boss Magazine -
America's Journal of Pond Management
Joined: Dec 2008
Posts: 4,791
Likes: 14
O
Omaha Offline OP
Moderator
Ambassador
Field Correspondent
Lunker
OP Offline
Moderator
Ambassador
Field Correspondent
Lunker
O
Joined: Dec 2008
Posts: 4,791
Likes: 14
I have a clean slate here so I can do whatever. And considering the articles you've written, I think I'll go ahead and do whatever you suggest. laugh

Joined: Jan 2011
Posts: 292
F
Offline
F
Joined: Jan 2011
Posts: 292
Hey Omaha! Whether its a one acre home pond or 1000 acre lake theres nothing more frustrating than knowing you have fish but simply can't find them. You know that old saying "90% of the fish are in 10% of the water" or "10% of the fisherman catch 90% of the fish"? Not to oversimplify but 30 yrs of on the water research has proven that you can divide (almost) any body of water and fish location into 4 key search areas. Shallow....1st break....2nd break...deep. But fish don't just move from one to the other willynilly...create travel lanes for them using that free concrete...and if you can, define each holding area with the concrete or even the lack of it.*NOTE* If you go too crazy with the concrete then you've defeated your purpose and the non-concrete areas will become the "something different" that they're drawn to. In a perfect world I'd have a long sloping point on the NW side of the pond with the top about 4' deep(SHALLOW) and 30' wide that tapers down and intersects with that 1ST BREAK (6-7'?) then tapers down some more to that 2ND BREAK ( 10-12'?) then bottoms out at the DEEP (18+') Be creative with your use of the concrete on this point. But I promise that 90% of the time you WILL find fish holding-feeding-loving life-SOMEWHERE along the length and width of this point!! GOOD LUCK


" EVERY DAY I'M AMAZED BY HOW MANY THINGS I DON'T KNOW AND HOW MUCH STUFF I DON'T UNDERSTAND"
Joined: Aug 2006
Posts: 5,712
Likes: 3
Moderator
Ambassador
Field Correspondent
Lunker
Offline
Moderator
Ambassador
Field Correspondent
Lunker
Joined: Aug 2006
Posts: 5,712
Likes: 3
Omaha -- lots of great advice and ideas.

Over three winters I built an underwater rock wall that almost always produces a few fish when fishing is really slow.

At this point, I really don't know the height and width of the underwater rock wall I "built."

Over three winters, when there was little snow, yet the ice was thick, I'd take load after load of front-end-loader bucketfuls of WV rocks to a particular part of the pond. The wall extends nearly straight out about 30 feet from the shore, on the North-East side of the pond. For three seasons I piled rocks on the ice in this area. There are now a lot of rocks out there.

Even during the lowest water season, none poke up above the water. The top of the pile probably averages 1-2 feet below the water most of the year. The deepest rocks are about 4-5 feet down. In the summer time, if the water is relatively clear, I can see thousands of small bass and bluegill on both sides of this wall.

In the winter, when the ice is out, it is nearly a guaranteed place to get a couple of trout or bass for winter. In the summertime, it is nearly a guaranteed place to get some bass for an unplanned fish dinner.

Good fishn'
Ken


Subscribe to Pond Boss Magazine

Peculiar Friends are Better than No Friends at All!
Joined: Dec 2008
Posts: 4,791
Likes: 14
O
Omaha Offline OP
Moderator
Ambassador
Field Correspondent
Lunker
OP Offline
Moderator
Ambassador
Field Correspondent
Lunker
O
Joined: Dec 2008
Posts: 4,791
Likes: 14
Priceless advice as usual. Incredible. I have so much to go off of and am really looking forward to this phase of the construction. Whatever we decide to name this pond will have to have "built by Pond Boss" beneath it. Thanks so much FFF and catmando for your recent advice. These will definitely be implemented along with Bill Cody's pointers and Travis's input. I can't wait to tell a kid "toss it over there" and have him catch a fish because I knew we put a rock pile there. Man, I'll look like a genius! Haha. Any more advice is greatly appreciated. Soon I will draw up my plans on the layout and see what you think. I'm very much a visual person so making a diagram would help me a great deal when I get out there with a bobcat bucket full of rock.

Joined: Jan 2008
Posts: 8,792
Likes: 68
Chairman, Pond Boss Legacy award; Moderator; field correspondent
Lunker
Offline
Chairman, Pond Boss Legacy award; Moderator; field correspondent
Lunker
Joined: Jan 2008
Posts: 8,792
Likes: 68
Josh

I used a skid loader on 80T of rock, but had to hand place most of it because were were 3/4 full pool - you know the story. You will be at an advantage with much less water. At any rate I can help you with boulder piles/fields if you want - I used plans directly from PB forum.

If I were to do it over again I'd follow Bill's and Aaron Matos advice and build a shelf around a section of the pond 3-4' deep and make my SMB beds there. You've seen how many I built by hand, it's not rocket science, but it takes a long long time solo. I think I could improve on my design a lot and will relate my ideas to you.

If I were you I'd get as much concrete as possible and just stack it. You may not use it all for pond structure but I bet you will for your siltation/catch ponds - that rock will be very useful in making sediment dykes to slow the water and allow particulate to drop and not flow into your pond.

IMO you can't ever have enough rock around...you can make paths, casting platforms, structure, etc. Considering we Nebraskans are not blessed with much rock over a fist size in the glacial till, I'd hold onto whatever you can get your hands on.


Many men go fishing all of their lives without knowing that it is not fish they are after. ~ Henry David Thoreau

[Linked Image from i1261.photobucket.com]


Joined: Dec 2008
Posts: 4,791
Likes: 14
O
Omaha Offline OP
Moderator
Ambassador
Field Correspondent
Lunker
OP Offline
Moderator
Ambassador
Field Correspondent
Lunker
O
Joined: Dec 2008
Posts: 4,791
Likes: 14
So how I am reading this is that you're bringing your buckets and a shovel when this is ready to go? wink


I will rely on your experiences a great deal when I get ready to place the rock, for sure. Considering how great a pond you have now, I can only imagine how wonderful a BOW would be if you'd done it the "right way".

Anyway, from what I understand we have two truckload piles out there already to work with so it's a great start.

Joined: Jan 2008
Posts: 8,792
Likes: 68
Chairman, Pond Boss Legacy award; Moderator; field correspondent
Lunker
Offline
Chairman, Pond Boss Legacy award; Moderator; field correspondent
Lunker
Joined: Jan 2008
Posts: 8,792
Likes: 68
Go get it Josh...and keep getting it at every opportunity. I already thought of a few other cool projects you could use extra concrete for... cool


Many men go fishing all of their lives without knowing that it is not fish they are after. ~ Henry David Thoreau

[Linked Image from i1261.photobucket.com]


Joined: Dec 2008
Posts: 4,791
Likes: 14
O
Omaha Offline OP
Moderator
Ambassador
Field Correspondent
Lunker
OP Offline
Moderator
Ambassador
Field Correspondent
Lunker
O
Joined: Dec 2008
Posts: 4,791
Likes: 14
All ideas welcome. I got so many plans, I've filled about three notebooks. As soon as the ice is off the water comes out. As soon as we get a week forecasted of clear weather, we get two trucks hauling dirt away and ready for an amateur (me) on a bobcat to contour the bottom. Ready as ever. No distractions like last summer.

Joined: Mar 2005
Posts: 21,475
Likes: 264
E
Moderator
Hall of Fame 2014
Lunker
Offline
Moderator
Hall of Fame 2014
Lunker
E
Joined: Mar 2005
Posts: 21,475
Likes: 264
A few added tips to consider. Large chunks of crete (2ft X 2 ft.) make great “Initiator Rock” . See this on making SMB beds.

http://forums.pondboss.com/ubbthreads.php?ubb=showflat&Number=133192&page=1

http://www.helpourfisheries.com/how_to_build_a_nest.htm


Rock/crete piles just away from SMB nests (away from shore and plants and wood cover) are key for survival of young SMB avoiding predation. See recent PB mag article in Cutting Edge.

Here is the real deal - notice the “Initiator Rock” .

Actual SMB bedding




Last edited by ewest; 03/07/11 11:11 PM.















Joined: Jan 2009
Posts: 28,422
Likes: 794
Moderator
Ambassador
Field Correspondent
Lunker
Online Content
Moderator
Ambassador
Field Correspondent
Lunker
Joined: Jan 2009
Posts: 28,422
Likes: 794
esest, so the “Initiator Rock” is like beer? wink


www.hoosierpondpros.com


http://www.pondboss.com/subscribe.asp?c=4
3/4 to 1 1/4 ac pond LMB, SMB, PS, BG, RES, CC, YP, Bardello BG, (RBT & Blue Tilapia - seasonal).
Joined: Dec 2008
Posts: 4,791
Likes: 14
O
Omaha Offline OP
Moderator
Ambassador
Field Correspondent
Lunker
OP Offline
Moderator
Ambassador
Field Correspondent
Lunker
O
Joined: Dec 2008
Posts: 4,791
Likes: 14
Very cool Eric. This will be implemented as well.

Scott, I think it's more like a wine cooler at that point isn't it? laugh

Joined: Apr 2002
Posts: 15,112
Likes: 478
B
Moderator
Ambassador
Field Correspondent
Lunker
Online Content
Moderator
Ambassador
Field Correspondent
Lunker
B
Joined: Apr 2002
Posts: 15,112
Likes: 478
Another beneficial thing that I find concrete pieces good for are lining the shoreline in the wave splash zone. This minimizes sediment resuspension due to wave action - a big plus.


aka Pond Doctor & Dr. Perca Read Pond Boss Magazine -
America's Journal of Pond Management
Page 1 of 2 1 2

Link Copied to Clipboard
Today's Birthdays
cro, HC1968
Recent Posts
Can anyone ID these minnows?
by Boondoggle - 03/29/24 09:18 AM
Relative weight charts in Excel ? Calculations?
by Boondoggle - 03/29/24 09:00 AM
pond experience needed
by esshup - 03/29/24 08:19 AM
Dewatering bags seeded to form berms?
by RogersTailgate - 03/29/24 05:45 AM
New pond middle TN: establishing food chain?
by Bill Cody - 03/28/24 07:57 PM
Happy Birthday Bob Lusk!!
by FireIsHot - 03/28/24 07:33 PM
Working on a .5acre disaster, I mean pond.
by PRCS - 03/28/24 06:39 PM
Fungus infection on fish
by nvcdl - 03/28/24 06:07 PM
1 year after stocking question
by esshup - 03/28/24 04:48 PM
Yellow Perch Spawn 2024
by H20fwler - 03/28/24 04:29 PM
New 2 acre pond stocking plan
by LANGSTER - 03/28/24 03:49 PM
Newly Uploaded Images
Eagles Over The Pond Yesterday
Eagles Over The Pond Yesterday
by Tbar, December 10
Deer at Theo's 2023
Deer at Theo's 2023
by Theo Gallus, November 13
Minnow identification
Minnow identification
by Mike Troyer, October 6
Sharing the Food
Sharing the Food
by FishinRod, September 9
Nice BGxRES
Nice BGxRES
by Theo Gallus, July 28
Snake Identification
Snake Identification
by Rangersedge, July 12

� 2014 POND BOSS INC. all rights reserved USA and Worldwide

Powered by UBB.threads™ PHP Forum Software 7.7.5