Pond Boss Magazine
https://www.pondboss.com/images/userfiles/image/20130301193901_6_150by50orangewhyshouldsubscribejpeg.jpg
Advertisment
Newest Members
Mcarver, araudy, Ponderific2024, MOLINER, BackyardKoi
18,502 Registered Users
Forum Statistics
Forums36
Topics40,963
Posts557,983
Members18,503
Most Online3,612
Jan 10th, 2023
Top Posters
esshup 28,535
ewest 21,499
Cecil Baird1 20,043
Bill Cody 15,150
Who's Online Now
6 members (Bill Cody, Bigtrh24, FireIsHot, Dave Davidson1, jmartin, Boondoggle), 1,216 guests, and 375 robots.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Joined: Dec 2010
Posts: 5
M
Mino Offline OP
OP Offline
M
Joined: Dec 2010
Posts: 5
Dear Forum,

I’m new to this forum and new to ponds but have done enough research to realize that even with my little project it still takes some savvy engineering and competent construction techniques to produce a desirable result. My pond will have 10+ acres of watershed, approximately an acre of surface area, will be eight to ten feet deep, and have a dam on one end that will be approximately six feet high on the downstream side including the freeboard.

My concern that I would appreciate some feedback on is in regard to designing the primary spillway / outflow. I don’t have the correct spillway dimension requirements yet but once obtained I wonder if the following approach would seem sound to the experienced members of this site.

I am thinking of leaving a small section of the dam unfinished as a “temporary construction drain” to allow inconvenient rainfalls to temporarily bypass the primary spillway construction area while I build it. I would like to use 24” plastic drainpipe to create the primary spillway, the number of pipes to be placed through the dam will be determined by the properly engineered flow requirements. This pipe is double walled, corrugated outside, smooth inside and has “O” ring seals to join and seal them together. 90-degree sealed elbows are available for this pipe. I would install this pipe in the dam, close to level with only a slight down slope to the outlet end, and to the proper depth so that a 90-degree elbow placed on the inlet end, when turned up, will create an upright standpipe spillway inlet, basically a downfall spillway design.

I intend to excavate a single trench through the new dam for the pipe(s), and dig two, 12” wide “anti-seep trenches” across and at 90 degrees to the pipe trench that extend 3’-4’ feet to either side and below the pipe trench. Using the earth trenches as a form I believe I can pour a shallow bed of mildly “soupy” concrete in this “trench complex”, roll in the pipe, put a pre-made inlet standpipe form and pre-made forms for the top of the “anti-seep wings” in place (the outlet apron form will already be in place) and finish as a single concrete pour.

Since I am not building rocket parts, any shape “defects” resulting from a very mildly “soupy” concrete mix should be entirely livable, the “soupy” consistency being desirable to eliminate as many voids as possible. Re-rod will already be in place where possible and pre-cut pieces added as necessary in the forms during the pour. All pipe joints will be sealed in concrete. Except for some of the standpipe inlet area, the concrete covering the pipe will be buried in “dam-quality” compacted earth. The spillway pipe inlet will be near the dam edge but sufficiently into the pond to allow for proper pipe filling and to avoid erosion issues associated with high, localized escaping water velocities. The area between the standpipe inlet and dam will be armored with rip-rap for insurance.

The wooden standpipe inlet form will allow for a protective concrete and re-rod tower to be made around the upturned plastic standpipe upon which a debris catch can be mounted. A 4”-6” PVC drainpipe will be installed in the concrete bed along with the primary spillway pipe as my topography will only allow me to gravity drain to the depth of the bottom of the spillway pipe.

Separate from this spillway complex I will install a small diameter, height / depth adjustable, flexible siphon tube with a downstream shutoff valve, and bury the siphon tube in the upper freeboard area of the dam. The siphon tube is to provide a means of slightly (albeit slowly) adjusting the final water level set-point, but is primarily intended to provide a small but nearly continuous supply of water during non-freezing months to a number of downstream waterscapes in my yard, just enough to keep them wet.

There are several reasons I am considering this approach. First, I believe this design lends itself to a “hidden”, unimposing and relatively natural look. Second I only want to do this once so I want the structure to be relatively permanent. Since plastic and concrete should last a lifetime or more, I believe undesirable seepage that leads to erosion then becomes the primary concern. Pouring mildly “soupy” concrete into appropriate and well compacted soil that has been excavated to leave rough walls would seem to lend itself to a very good seal between the earth dam and the penetrating drain structure, particularly considering the imposition created by the large, concrete, “anti-seep wings” in this design. The seal between the concrete and the plastic pipe(s) should be excellent, but if not is of absolutely no consequence.

As this spillway structure is at most 6’ below the water level there is not much head pressure on the spillway system. Still, I think it might be best to not complete the unfinished “temporary construction drain” area of the dam that has kept the pond off the spillway until the partially complete spillway structure has seen at least several rains to help it settle and seal. After a few rains, then compact more dam above the exposed concrete spillway structure and finally finish the “temporary construction drain” area of the dam in time to seed the entire dam and emergency spillway. This would allow the dam and spillway structure see a few mild rains and then a good winter freeze / thaw cycle before the heavy spring rains hit. I am also thinking of leaving the pond drain open until after receiving several good spring rains to further keep the load off the dam and spillway and allow for more rain induced settling-in before subjecting these new structures to a permanent, full pond load. Some of this may seem like overkill but I am new to this and would rather put in a little more time and effort up front if it might increase my odds of success.

I have only recently added this 5 acres to my backyard and cannot believe how excited and absorbed I suddenly am in this project. I have dreamt of this for years but only recently have I been able to pry loose this land from my farmer neighbor. I only add this explanation to let you know I believe a may be a “pond guy” in the making and as such I truly would appreciate any good advice.

Thanks in advance, Michael
PS Love the site by the way!




Last edited by Mino; 12/24/10 02:52 PM. Reason: paragraphing
Joined: Jul 2009
Posts: 3,505
Likes: 3
Ambassador
Field Correspondent
Hall of Fame
Lunker
Offline
Ambassador
Field Correspondent
Hall of Fame
Lunker
Joined: Jul 2009
Posts: 3,505
Likes: 3
Hey, Michael, welcome to Pond Boss! We're glad you found us and especially at such an important stage in your project. Hang on for some great expert feedback from someone other than me! Merry Christmas!


Todd La Neve

[Linked Image from i108.photobucket.com]
Click Here to Subscribe to Pond Boss Magazine

1.5 & .5 ac ponds - LMB, BG, RES, YP, GC, HSB
Joined: Dec 2010
Posts: 5
M
Mino Offline OP
OP Offline
M
Joined: Dec 2010
Posts: 5
LOL. Thank you and Merry Christmas to you Todd.

Joined: Jul 2008
Posts: 1,094
Likes: 1
S
Lunker
Offline
Lunker
S
Joined: Jul 2008
Posts: 1,094
Likes: 1
i dont understand 100% what your talking about on your design. but if i am reading right you are wanting to force/push a 24" pipe horizontally into concrete. i would think that would be almost impossible. you cant have the concrete very soupy or your aggregate will seperate from the cement.

put the pipe in first and leave it off the bottom of the trench several inches and then pour a proper mixed concrete around it.


Scott Hanners
Joined: Jan 2009
Posts: 28,535
Likes: 842
Moderator
Ambassador
Field Correspondent
Lunker
Offline
Moderator
Ambassador
Field Correspondent
Lunker
Joined: Jan 2009
Posts: 28,535
Likes: 842
Also, make sure that the pipe is somehow anchored/tied down to the ground to ensure it won't float in the concrete. I second the thought of having it a couple of inches off of the ground.

But other pond builders have just used clay around the overflow pipe, compacted it with a pogo stick type compactor, and used anti-seep collars attached to the pipe.


www.hoosierpondpros.com


http://www.pondboss.com/subscribe.asp?c=4
3/4 to 1 1/4 ac pond LMB, SMB, PS, BG, RES, CC, YP, Bardello BG, (RBT & Blue Tilapia - seasonal).
Joined: Dec 2010
Posts: 5
M
Mino Offline OP
OP Offline
M
Joined: Dec 2010
Posts: 5
By “… pouring a shallow bed … “ I meant pouring only 3-4” of concrete in the trench first, then immediately putting the pipe in the trench and sitting it on top of this 3-4” of fresh concrete and then immediately continuing the pour from there.

However, having thought over the helpful comments made so far I am rethinking some things if I go the concrete route. I had thought I would use the front bucket on my tractor to hold the pipe down during the pour, but now think I would also like to chain the pipe to some preset anchors in the bottom of the trench for additional insurance. If the pipe floated out during the pour it would be a major disaster. For this and other reasons I now think it would be far better to properly locate the pipe in the trench, sitting in on concrete blocks to keep it off the bottom, before beginning any concrete pouring and hope the concrete fills all voids beneath the pipe. I may need to ensure a vibrator is used during the installation.

Thinking over this floating issue also made me realize that the wetter the mix the more likely the floating problem. I have no training or experience in concrete work other than watching the professionals that have done some jobs on my property before and know they vary the water content depending on what they are trying to achieve. I think now I will want to ensure they not make it any wetter than necessary, a “proper” mix if you will, as scott69 recommends.

What got me thinking about concrete in the first place was not being able to imagine how one could possibly get good compaction under the “radius overhang” of a 24” diameter pipe, it would seem impossible to me. From what I have read compaction is critical, and not fully achieving it somewhere, especially around a pipe penetrating a dam, seems quite scary. But given your comments Essup I will look into the pogo-stick compactor you mentioned, as it would be far simpler if I could minimize any unnecessary concrete work.

Now I am beginning to wonder what extending an earth dam peninsula into the pond and locating the downfall spillway pipe in that peninsula would achieve. Oh-oh, this jelly of mine that passes for a brain is starting to have visions again …
Thanks for your patience with my inexperience and the quality feedback gentlemen, much appreciated. Merry Christmas, Michael

Joined: Jan 2006
Posts: 16,055
Likes: 277
D
Moderator
Lunker
Online Content
Moderator
Lunker
D
Joined: Jan 2006
Posts: 16,055
Likes: 277
It is generally recommended to have no foreign stuff in the dam; just well packed clay around an anti seep collar.


It's not about the fish. It's about the pond. Take care of the pond and the fish will be fine. PB subscriber since before it was in color.

Without a sense of urgency, Nothing ever gets done.

Boy, if I say "sic em", you'd better look for something to bite. Sam Shelley Rancher and Farmer Muleshoe Texas 1892-1985 RIP
Joined: May 2009
Posts: 5,722
Likes: 282
R
RAH Offline
Lunker
Offline
Lunker
R
Joined: May 2009
Posts: 5,722
Likes: 282
I know that this is counter to some advice given here, but my main pond, and two smaller ponds were made buy constructing a dam without a pipe, digging a trench for the pipe through the dam, installing the pipe and seep collars in the trench, and then packing clay into the trench with an excavator. My ponds hold water like a swimming pool - never a leak. I suppose it depends on the skill and knowledge of the excavator operator. I too am not fond of the cement option. The way to get compaction under a large diameter soft pipe is to dig the bottom of the trench to match the pipe bottom before laying the pipe. On my ponds the trench width was considerably wider than the pipe allowing plenty of room to work. I also used heavy gauge hard plastic pipe.

Joined: Mar 2005
Posts: 21,499
Likes: 267
E
Moderator
Hall of Fame 2014
Lunker
Offline
Moderator
Hall of Fame 2014
Lunker
E
Joined: Mar 2005
Posts: 21,499
Likes: 267
We have one that way RAH. Pipe added later as you note.

Welcome Mino. Another way I have seen is to use anti-seep collars 2 one about 4 feet into the face of the dam and a second about mid point. Then concrete was poured around both collars about a foot thick. Collars and about 1 foot of pipe on each side in concrete on both collars.

Last edited by ewest; 12/26/10 09:58 AM.















Joined: Dec 2010
Posts: 5
M
Mino Offline OP
OP Offline
M
Joined: Dec 2010
Posts: 5
I've been reading more and found several high-level studies of various large dam failures. They all mention that poor compaction under the haunch area of large diameter pipes in the dam is typically one of the main causes of failure, which is exactly what I am concerned about with a “pipe-thru-dam” design. They also cited anti-seep collar failures and no longer recommend them but instead recommend a filter diaphragm. The filter diaphragm seems like a great way to go, but would be a bit troublesome to construct.

RAH, I suspect you are right about the skill and knowledge of the equipment operator / crew making all the difference. I also suspect that like everything else there is an element of luck involved.

I’m starting to wonder if it wouldn’t be simpler to hire a helicopter with a big bucket and put it on 24 hour alert to airlift any excess rainfall over the dam!


Joined: Mar 2005
Posts: 21,499
Likes: 267
E
Moderator
Hall of Fame 2014
Lunker
Offline
Moderator
Hall of Fame 2014
Lunker
E
Joined: Mar 2005
Posts: 21,499
Likes: 267
Keep in mind that there are literally millions of ponds with a pipe through dam system and a very small % have a problem. The key is to find a good pond builder and stress your concern to the builder so special attention will be focused there. Every type of system has its + and - .


Last edited by ewest; 12/27/10 08:46 AM.















Joined: Dec 2010
Posts: 5
M
Mino Offline OP
OP Offline
M
Joined: Dec 2010
Posts: 5
Good advice Ewest. I was hoping I could do all the necessary homework, be the brains so to speak, and simply hire someone to move the dirt around. But that is not looking like such a good idea anymore, especially given the amount of expert construction technique I have discovered is necessary. Who knew? :-) I may need to find and hire someone with the proper experience, even if only building a very small pond dam like mine.

Thanks to everyone for their patience and help dealing with yet another "newbie / clueless wonder". You all can at least take comfort in having done a good deed by steering me in the right direction, even if I'm not sure of the best solution at this point. Thanks to everyone's help I'm much better prepared now to pursue this project. I owe you guys some pics when I get this all together. We all like looking at each others pond pics, right? Hopefully they won't be pics of a catastrophic dam failure. :-)

PS Don't you just love forums like this? Any hobby, project, etc a person could want to involve themselves in seems to have a forum where everyone can share their ideas and experiences.

Joined: Dec 2010
Posts: 1
J
Offline
J
Joined: Dec 2010
Posts: 1
Am building a new 1.5 - 2 acre pond for recreation. will end up about 11-13 ft deep. Amconsidering the siphon method of ron off control. Also am surrounding two artisian well heads from which i hope to keep the ponds full. comments Thx am in texas

Joined: Jul 2009
Posts: 3,505
Likes: 3
Ambassador
Field Correspondent
Hall of Fame
Lunker
Offline
Ambassador
Field Correspondent
Hall of Fame
Lunker
Joined: Jul 2009
Posts: 3,505
Likes: 3
Hey, James, welcome to the forum and a Happy New Year to you! You may want to move this post to a new thread (or just start a new thread, which may be easier to figure out) so your post gets more attention and you get more feedback. Hang on for some expert input on your question.


Todd La Neve

[Linked Image from i108.photobucket.com]
Click Here to Subscribe to Pond Boss Magazine

1.5 & .5 ac ponds - LMB, BG, RES, YP, GC, HSB
Joined: Jan 2011
Posts: 1
P
Offline
P
Joined: Jan 2011
Posts: 1
Two things to consider. "High cube" or smooth inner double wall pipe moves much more water than regular corrugated. 24" of this might be overkill, have you calculated how much water normally travels through this area?

Secondly, I hate rebar in concrete for one reason, it will rust, it will expand and it will fail a concrete structure. Save yourself some time and money and use fiber in the concrete instead. It usually costs only around 6 dollars per yard.

Third, consider using a vibrator on your concrete. This will compact and get you a better seal. Also, dig BELOW the pipe for the bottom fill. Too soupy of a mix and you will have an epic fail. I did a very similar design on my pond.

Joined: Jan 2009
Posts: 28,535
Likes: 842
Moderator
Ambassador
Field Correspondent
Lunker
Offline
Moderator
Ambassador
Field Correspondent
Lunker
Joined: Jan 2009
Posts: 28,535
Likes: 842
You can gain some longivity on the rebar by using epoxy coated rebar.


www.hoosierpondpros.com


http://www.pondboss.com/subscribe.asp?c=4
3/4 to 1 1/4 ac pond LMB, SMB, PS, BG, RES, CC, YP, Bardello BG, (RBT & Blue Tilapia - seasonal).

Link Copied to Clipboard
Today's Birthdays
There are no members with birthdays on this day.
Recent Posts
YP Growth: Height vs. Length
by Bill Cody - 04/26/24 07:12 PM
Inland Silver sided shiner
by Bill Cody - 04/26/24 07:04 PM
Non Iodized Stock Salt
by esshup - 04/26/24 05:33 PM
Happy Birthday Sparkplug!
by sprkplug - 04/26/24 11:43 AM
New pond leaking to new house 60 ft away
by gehajake - 04/26/24 11:39 AM
What did you do at your pond today?
by gehajake - 04/26/24 11:26 AM
Compaction Question
by FishinRod - 04/26/24 10:05 AM
Prayers needed
by Sunil - 04/26/24 07:52 AM
What’s the easiest way to get rid of leaves
by liquidsquid - 04/26/24 06:58 AM
Low Alkalinity
by liquidsquid - 04/26/24 06:49 AM
1/2 Acre Pond Build
by Lumberman1985 - 04/25/24 03:01 PM
Howdy from West Central Louisiana
by ewest - 04/25/24 02:07 PM
Newly Uploaded Images
Eagles Over The Pond Yesterday
Eagles Over The Pond Yesterday
by Tbar, December 10
Deer at Theo's 2023
Deer at Theo's 2023
by Theo Gallus, November 13
Minnow identification
Minnow identification
by Mike Troyer, October 6
Sharing the Food
Sharing the Food
by FishinRod, September 9
Nice BGxRES
Nice BGxRES
by Theo Gallus, July 28
Snake Identification
Snake Identification
by Rangersedge, July 12

� 2014 POND BOSS INC. all rights reserved USA and Worldwide

Powered by UBB.threads™ PHP Forum Software 7.7.5