Forums36
Topics40,944
Posts557,788
Members18,483
|
Most Online3,612 Jan 10th, 2023
|
|
|
Joined: Jun 2005
Posts: 2
Fingerling
|
OP
Fingerling
Joined: Jun 2005
Posts: 2 |
Hello all! I am back after about 2 years, trying to get back to my small (slightly less than) 1/2 pond here in Gettysburg, PA. I want to install a concrete dam on the outlet of my pond where the earth has eroded away. The dam would not need to be any higher than 8 feet nor any wider than 8 feet. Currently I have a 10 inch dia overflow pipe that runs under the burm and out into the creek. This is too small to handle the flow when we get a lot of rain; consequently, erosion continues to take place. I want to put a pond drain into the concrete dam and also a larger overflow pipe to handle the excess water. Are there any plans or specs that would help me properly design and build the concrete dam. I have poked around on the forum but have not read anything that meets my need. Thank you.
Ed Moe
|
|
|
|
Joined: Jul 2006
Posts: 7,615 Likes: 5
Ambassador Field Correspondent Lunker
|
Ambassador Field Correspondent Lunker
Joined: Jul 2006
Posts: 7,615 Likes: 5 |
Hello Ed, thanks for joining in and posting! Hang on for some expert feedback.
JHAP ~~~~~~~~~~ "My mind is a raging torrent, flooded with rivulets of thought cascading into a waterfall of creative alternatives." ...Hedley Lamarr (that's Hedley not Hedy)
|
|
|
|
Joined: Aug 2009
Posts: 414
Lunker
|
Lunker
Joined: Aug 2009
Posts: 414 |
PAUL
|
|
|
|
Joined: Jan 2005
Posts: 1,239
Lunker
|
Lunker
Joined: Jan 2005
Posts: 1,239 |
Ed post pic's of the pond and drainage issues, it will help us help you.
The road goes on forever and the party nevers end...............................................
|
|
|
|
Joined: Apr 2006
Posts: 3,261
Ambassador Lunker
|
Ambassador Lunker
Joined: Apr 2006
Posts: 3,261 |
i dont know how much help this is to you, but ours works good. it was formed in concrete w/ 20' rr bridge timbers on top. before renovation it had a bad undermine on the outflow/back side, and i covered the aging bridge timbers with rebarred concrete set in deep footings. looks like this: before renovation back side after renovation back side front side may give you some ideas anyways.
Last edited by dave in el dorado ca; 02/09/10 02:01 PM.
GSF are people too!
|
|
|
|
Joined: Jun 2005
Posts: 2
Fingerling
|
OP
Fingerling
Joined: Jun 2005
Posts: 2 |
Gentlemen, Thanks for the great feedback and encouragement. We are currently under about 2 feet of snow and we have another foot or so coming down now, so it may be a while before I can take some photos to give you a better understanding of what I want to do. Thanks again.
Ed Moe
|
|
|
|
Joined: Aug 2009
Posts: 414
Lunker
|
Lunker
Joined: Aug 2009
Posts: 414 |
This might be handy wilst planing/reading/discusing your project, helps me a lot to overcome obsticales or consume/understand plans drawings and explenations. http://www.dec.ny.gov/docs/water_pdf/swdmglossary.pdf
PAUL
|
|
|
|
Joined: Nov 2004
Posts: 1,074
Lunker
|
Lunker
Joined: Nov 2004
Posts: 1,074 |
Dave Great pictures and great work. Spillways that wash out are a constant problem. It looks like you fixed yours for good.
|
|
|
Moderated by Bill Cody, Bruce Condello, catmandoo, Chris Steelman, Dave Davidson1, esshup, ewest, FireIsHot, Omaha, Sunil, teehjaeh57
|
|