Live and learn. 5 years down the road and erosion has eaten away at the banks under my bridges necessitating they be reworked. Original Build


Bridge one has had rock added under and around it, 10' added to the length and it has been raised 12"....more like 18".

[Linked Image from i.ibb.co]


Bridge two has had rock added under it and around it as well as the center boards replaced. The cattle didn't do me any favors either walking down the sides of the bridge creating channels for rain water to carry away the dirt.

[Linked Image from i.ibb.co]


Bridge three has rail road ties and rock added as well as 10' added to the length.

[Linked Image from i.ibb.co]


I hope these repairs will last a little longer.