|
Forums36
Topics40,961
Posts557,945
Members18,499
|
Most Online3,612 Jan 10th, 2023
|
|
|
Joined: Jan 2012
Posts: 45
|
OP
Joined: Jan 2012
Posts: 45 |
Only took 21 days to get to day 4 because it was so wet. Cook is very happy with soil lots of good clay to work with. It will have a small road that goes all the way around, a small waterfowl area that can be planted and because it will end up being 14 foot levee with 12’ water line instead which give 2’-0” more water than planned. Things will stop again because of rain.
|
|
|
|
Joined: Jan 2012
Posts: 45
|
OP
Joined: Jan 2012
Posts: 45 |
|
|
|
|
Joined: Jan 2009
Posts: 10,458 Likes: 2
Ambassador Field Correspondent Hall of Fame Lunker
|
Ambassador Field Correspondent Hall of Fame Lunker
Joined: Jan 2009
Posts: 10,458 Likes: 2 |
Looks great! How many acres will it be in the end and what will the maximum depth be? I like the deer stand in the background... Might not even have to move it depending on where the water line will end up. HAHA
|
|
|
|
Joined: Jan 2012
Posts: 45
|
OP
Joined: Jan 2012
Posts: 45 |
Here one more view Not quite sure yet because of the higher levee. Will be deeper than 13' max because the track equipment is below the water level the other day and their not done moving dirt out. The top of the levee will start be about 8 feet away bottom of stand. Just how it worked out.
|
|
|
|
Joined: Mar 2011
Posts: 621
|
Joined: Mar 2011
Posts: 621 |
Thats going to be beautiful when its done! Congrats.
|
|
|
Moderated by Bill Cody, Bruce Condello, catmandoo, Chris Steelman, Dave Davidson1, esshup, ewest, FireIsHot, Omaha, Sunil, teehjaeh57
|
|
|