Talking to my buddy about building my acre pond. He has a D5 dozer..he was thinking this might be too small for this project. What all equipment is usually required to build a well contoured pond?
|
|
|
|
Joined: Apr 2006
Posts: 3,261
Ambassador Lunker
|
Ambassador Lunker
Joined: Apr 2006
Posts: 3,261 |
hi azngunner, obviously a good operator(s) is imperative, equip. we used included a big cat excavator (track hoe) w/ 4' bucket, a D4 cat dozer, and an older (small) JD550 dozer.
GSF are people too!
|
|
|
|
Joined: Dec 2007
Posts: 267
Lunker
|
Lunker
Joined: Dec 2007
Posts: 267 |
They guy that I am talking to about building my pond uses a D4. He said he just got done doing one in Huntsville that was a little under 3 acres with the D4 and a drag-line.
Water dries, rocks crumble, and trees die. The only thing that is eternal is the reputation we leave behind. - Ancient Viking Proverb
|
|
|
|
Joined: Jan 2006
Posts: 16,051 Likes: 277
Moderator Lunker
|
Moderator Lunker
Joined: Jan 2006
Posts: 16,051 Likes: 277 |
A D5 in the hands of a good operator can do it. I had 2 of them doing a pond for me and it took about a week.
It's not about the fish. It's about the pond. Take care of the pond and the fish will be fine. PB subscriber since before it was in color.
Without a sense of urgency, Nothing ever gets done.
Boy, if I say "sic em", you'd better look for something to bite. Sam Shelley Rancher and Farmer Muleshoe Texas 1892-1985 RIP
|
|
|
|
Joined: Nov 2004
Posts: 1,074
Lunker
|
Lunker
Joined: Nov 2004
Posts: 1,074 |
The man in the seat is the main part of any piece of equipment.
Usually the conditions determine the equipment you use. Rock, mud, distance.
A small dozer will move the earth with enough time.
Two dozers pushing side by side moves 3 times as much dirt as 1 dozer.
OTTO
|
|
|
|
Joined: Dec 2007
Posts: 14
Lunker
|
OP
Lunker
Joined: Dec 2007
Posts: 14 |
Doing more thinking into this pond idea...my concerns deal with the D5 dozer and traction. I plan on doing a 3 to 1 or 4 to 1 slope..my buddy's D5 with standard tracks...is this enough, or do we need different tracks? He tells me that power is not the problem, but he thinks his tracks won't be able to push dirt out. Also, if it comes down to it...how much is rental for a D6 hightracks dozer going for these days?
|
|
|
|
Joined: Dec 2007
Posts: 267
Lunker
|
Lunker
Joined: Dec 2007
Posts: 267 |
Here in Bryan I can get a D6 for roughly $600 per day or $2800 per week or $7000 a month. These prices can fluctuate and it also may increase with delivery fee, insurance, tax, etc.
Hiring somebody who already owns the D6 is $85/hr. So in essence it costs me an extra $40 to hire somebody to do a small job. On a job that takes a few weeks, that is where you will notice a big difference.
Last edited by ezylman; 04/23/08 10:24 AM.
Water dries, rocks crumble, and trees die. The only thing that is eternal is the reputation we leave behind. - Ancient Viking Proverb
|
|
|
Moderated by Bill Cody, Bruce Condello, catmandoo, Chris Steelman, Dave Davidson1, esshup, ewest, FireIsHot, Omaha, Sunil, teehjaeh57
|
|