In Illinois, I recall the break-point as being a 25 ft dam OR 50 acre-feet of retention at normal pool...? The "over 25'dam" scenario would require a state registered engineer for construction and yearly maint checks by a state reg. engineer. I think the 50 acre-feet limit only precludes participation by the NRCS for construction assistance.