Sad deal.

Good reason to have:
1. plenty of freeboard to hold temporary excess water
2. wide flat emergency overflow to keep main part of dam from being breeched
3. rock or riprap covering the emergency overflow and up the sides of the emergency overflow so water does not cut an erosion ditch when excessive flow happens.

When you redo it, you can make the pond even better than before.


John

I subscribe to Pond Boss Magazine