So I've been doing a take off on how much money it will cost me for this dredge, once I finalize I'll make a post explaining all of it.. but I'm looking here at about 45$ savings if I use electrical conduit instead of sched 40 for buying 25 2 inch by 10 ft pipes. I don't think they will be more pressurized than 10 psi max.. does anyone know of problems using elect conduit instead of schedule 40 to move water?


6.5 acre
YP mainly
Northern LP Michigan