I have seen spillways built of concrete and 2x6 boards. The boards are stacked in a groove and by adding or removing boards you change the water level.

Do a search for "flash board risers"

Old thread about the subject

Pay attention to the system Grundulis made. All by hand.

Last edited by snrub; 12/12/15 09:18 AM.

John

I subscribe to Pond Boss Magazine