The dam is 100% yellow clay, no top soil at all. The key way is 8 feet deeper than the dam and 12 feet wide.didn't use a roller but I think the D9 dozer did a fair job of compacting. All top soil was placed over the dam after it was completed. We never hit bedrock or shale, not even a gravel pocket. Can't figure out why its leaking. My contracter has been building ponds and lakes for 10+ years and can't figure it out either. It's only been full 3 months but wouldn't think it would seep this much.
|
|
|