Forums36
Topics41,060
Posts559,030
Members18,564
|
Most Online3,612 Jan 10th, 2023
|
|
2 members (Boondoggle, jnshel),
703
guests, and
439
robots. |
Key:
Admin,
Global Mod,
Mod
|
|
|
Joined: Jan 2009
Posts: 28,663 Likes: 884
Moderator Ambassador Field Correspondent Lunker
|
Moderator Ambassador Field Correspondent Lunker
Joined: Jan 2009
Posts: 28,663 Likes: 884 |
Dale: What is the gph of that 6" pump? A 3" pump moving 14,000 gph would take 11.6 days. This pump would take 2.7 days running 24/7. 6" 60,000 gph trash pump @ Northern Tool If the water level in the pond is only 3' higher than the other pond, you would only be able to drop the water level 3' before the levels equalized and the siphon stopped working. (If I'm understanding your ponds correctly)
|
|
|
Moderated by Bill Cody, Bruce Condello, catmandoo, Chris Steelman, Dave Davidson1, esshup, ewest, FireIsHot, Omaha, Sunil, teehjaeh57
|
|