It is in desperate need of a bath and some polishing, but the bed build is pretty much complete, FINALLY!

Next is some fiberglass work and cargo/load lighting, along with just a little more shiny bling (chrome air horns and bumper the same style as the painted one).

After the outside, electornics, and box work is done, the graphics work will be done last....hopefully I'll get some sponsorship/advertising $$$'s to offset that expense....?

Over the winter, I'll be installing all electronics for on-board water quality monitoring, filtration, ammonia removal system, pumps, 8000 watt 120/240V generator, custom shelving and storage box modifications. Eventually, I plan to be able to heat and chill all, or individual water tanks....all from inside the cab while rolling...