I had the pond builder push over the trees and I harvested the wood after they where down. Worked well aspect I had to be quick getting the logs out of the way. I cut and dried them on site for 2 years and then had them milled into wood flooring. The wood flooring is installed in the house I built on site.

Last edited by lassig; 08/01/14 03:12 PM.