The unit will be located inside a building. It does not need to be a kit. In other words a 1/4-1/2HP Brookwood compressor may be all we need. 120v is also available.

The calcium is poured in the lines of the main system only. The main system does not have actual diffusers. It has 2 pair of 3/8" holes per line. Two midship and 2 at the end.

I can only assume that the standby system is the same.

P.S. The line is unweighted tubing with rebar strapped to it using both hose clamps and zip ties so there's nearly foot for foot of rebar to tubing.

Last edited by Hesperus; 07/16/14 01:05 PM.