Okay, now I'm with you. Around here, #53's are the common driveway mix....cheap, and full of fines and dust. It does indeed pack down hard.

There was a comment about calling a concrete plant for crusher, and that threw me. When we did concrete, stone size was important enough to specify #8 for the vast majority. We never used dust, or fines, to batch concrete.


"Forget pounds and ounces, I'm figuring displacement!"

If we accept that: MBG(+)FGSF(=)HBG(F1)
And we surmise that: BG(>)HBG(F1) while GSF(<)HBG(F1)
Would it hold true that: HBG(F1)(+)AM500(x)q.d.(=)1.5lbGRWT?
PB answer: It depends.