I have the same contractor coming out this weekend to ease the vertical (I kid you not) slope on the pond at the fill end, and another out soon to raise the dam up 2 feet to level 1 foot lower than originally planned. With that done I can see about getting the small silt pond built and then seed the area. I will only be 25-30% over the original budget and contract.