Sorry guys I keep forgetting to bring the camera. As of now we still haven't starting pumping water, but we are close. Hopefully I can flip the switch next week, which with this drought is going to be the only way I fill this pond in 2012. I went with a 5 HP 58 gpm pump with an electronic timer as I don't live on site. The electrician is running electric along side my water line to the pond so I can plug in my aerator (Vertex Air 1 plus package). Structure is now complete. This includes 50 yards of large rocks that makes up three rock piles, ten porcupine fish attractors, 100 cinder blocks, 20 pallets, several tires, two loads of gravel spread in various areas for spawning, and the 12 poles that my dock will be built on. I just used the bucket on my tractor to deepen area off of dock to 8-9' so kids can jump off. I will post pics yet this weekend, but anything else I need to do before I flip the switch?