Phase two of the DW problem is the rope idea with zip-ties. I just need to add the floats and we'll see how it works.

Up to 8 hours on the aeration start-up.

Lots of work but a lot of fun trying to get this old pond back in shape!

Attached Images
HPIM0656.JPG

Keith - Still Lovin Livin

https://youtu.be/o-R41Rfx0k0
(a short video tribute to the PB members we met on our 5 week fishing adventure)

Formerly: 2ac LMB,HSB,BG,HBG,RES