RC, I would dig out the driveway 4-6 to hold your gravel in. I did this with mine it helps alot. I actually put down 6" minus first for a base basically riprap. Then when that packed and dirt came through I covered it with 3" minus now when it thaws this spring I should be able to coat it with 2" minus then just maintenance and it should be good for life.


I believe in catch and release. I catch then release to the grease..

BG. CSBG. LMB. HSB. RES.

[Linked Image from i90.photobucket.com]