We are oh so close to being completed with the rough framing. Besides 4 small wall sections in the four corners of the upstairs, we are pretty much set to begin laying in the roof sheathing. The fly rafters were a special treat to install. We managed to do so from the inside. They overhang by 2 feet, so there were some seat-of-the-pants acrobatic events. They're done, and turned out great. -
-
- - I am dying to get the windows installed throughout the 2nd floor, but I gotta keep my eye on the roof prize for now.