What is the difference in the elevation for the emergency spillways between the two ponds (how much drops on the line between the two ponds can be expected)? I ask because it may be possible, with sufficient drop, to bring a drainage pipe from the upper pond on top of a gravel-filled pit that has a second pipe in the bottom that feeds the lower pond. This would increase the water handling ability due to maximum gravel surface area and also hydraulic pressure.